Memphis TN
Kitchen remodeling · Memphis

A kitchen built around how you actually use it.

Most kitchen problems are not about the cabinets. They are about where the sink is, whether two people can work at once, and what is behind the wall.

A kitchen remodel gets expensive when decisions arrive late — after demolition, when the wall is already open and the answer costs more. We work through layout, plumbing and electrical before the finishes are chosen, so the cabinet order and the countertop template happen against a plan that will not change underneath them. That sequencing is what keeps a kitchen remodel from running past its own schedule.

Experience
20+ years
Area
4 states
Licensed
GC
20+ yearsRenovations across the Memphis metro
Memphis + 4 statesMemphis metro · West TN · North MS · Eastern AR
One point of contactSame team from estimate to final walkthrough
Financing availableRenovation loans from $2k to $500k
What we handle

The parts of a kitchen that decide whether it works.

  • Layout decided before anything is ordered

    Where the sink, range and refrigerator go determines the plumbing, the electrical and the cabinet run. We settle that first, on a plan, with a tape line on the floor if it helps — because moving a supply line after the cabinets are on the wall is one of the most expensive mistakes a kitchen can hold.

  • The wall behind the cabinets

    Opening a kitchen wall means knowing what is in it — plumbing, electrical, wiring someone added twenty years ago, sometimes a supply line in an unexpected place. We document what is actually there before anyone prices from a floor plan.

  • Cabinetry, counters and tile that agree

    Cabinet boxes, counter material, backsplash and the floor all get measured against the finished wall, not the stud wall. Panels, scribe fillers and the plinth are what separate a kitchen that fits from one with gaps along the wall.

  • Ventilation that actually moves air

    A range hood rated for the cooktop, ducted properly and vented outside. A recirculating unit over a gas cooktop is a decision that affects the room every day for years, and it is worth making deliberately.

How it runs

From first walkthrough to a kitchen you cook in.

  • Photos or a walkthrough

    Send photos on WhatsApp or let us look at it in person. Bring a rough idea of what you want to change — we can usually tell from a walkthrough whether the layout or the finishes are the real problem.

  • Layout, scope and line items

    You get the work broken out — demolition, plumbing, electrical, drywall, cabinetry, counters, tile, appliances — so you can see where the money goes and cut anything you do not want.

  • Fixed schedule

    We give you a start date and a duration before signing. Cabinet lead time and countertop templating sit on the critical path, and we order them when the layout is settled rather than when we are ready to install.

  • Final walkthrough

    We walk the finished kitchen with you, fit and align doors and drawers, fix punch-list items, and hand over the warranty documents.

What moves the price

Why a kitchen cannot be priced from a photo.

Keep the layout or move it
Keeping the sink, range and refrigerator where they are is dramatically cheaper. Moving any of them means new supply and drain lines, new electrical, and possibly a moved gas line. This is the single biggest lever and it is yours to make.
Size of the room and the work triangle
A galley kitchen and an open kitchen with an island are different problems in different proportions. Room size and how the counters are used set the layout before any material does.
What is behind the wall
Undocumented plumbing, outdated wiring and added junctions change the scope after demolition. We show you what we find before we start the finish work.
Cabinet material and construction
Stock cabinets, semi-custom and custom differ in price and in lead time. Custom also means nobody else can build the boxes when something needs replacing in five years.
Countertop material
Laminate, quartz and natural stone are different material, different fabrication and different failure behavior. Natural stone needs a properly supported base that the cabinets must be able to carry.
Appliances
Where the appliances come from changes the electrical, the venting and sometimes the cabinet depths. Built-ins and a slide-in range are not interchangeable, and the panel widths have to match the openings.

We quote in writing after seeing the job. Anyone who gives you a firm kitchen price on the first phone call is guessing — and either they will not show up or the price will move once they see what is behind the wall.

Common questions

What homeowners ask before starting a kitchen.

How long does a kitchen remodel take?

A full gut kitchen is typically three to five weeks of work, plus cabinet and countertop lead time that happens before we start. Keeping the layout can shorten it considerably. We give you the schedule in writing before you sign, and we tell you which parts of the schedule are ours to control and which belong to the supplier.

Can I keep my cabinets?

Often, yes — and it is worth evaluating honestly. If the boxes are solid and the layout still works, refinishing or refacing them can be the best value in the room. If the layout is the problem, new cabinets are the cheaper answer than trying to force the old ones into a new footprint.

Do you handle permits?

Yes, when the scope requires it. Kitchen work that touches plumbing, electrical or gas usually does, and some jurisdictions require the permit pulled by a licensed holder. We handle the permit and the inspection scheduling.

Do you work in an occupied house?

Yes. Many of our jobs are in occupied homes, including occupied rentals. We contain the dust, keep a path you can walk through, and give you a realistic picture of what living through a kitchen remodel is like before you commit to it.

What happens if we find mold or water damage?

We stop, show you what we found and what it costs to address properly, and we do not proceed into cabinetry or finish work until it is resolved. That is non-negotiable, and it is the same reason we open the wall before we order anything.

Our work

What this actually looks like finished.

Staged living room in a fully renovated Memphis home — finished walls, trim, recessed lighting and finished flooring
Finished interior after a full renovation
Completed interior with painted brick accent wall, fireplace surround and finished ceiling in a rebuilt home
Interior finish after reconstruction
Before & after

Scroll to see the difference.

A dated 1980s kitchen before remodeling — dark oak cabinets, laminate counters, beige tile backsplash, older white appliances and a worn floor The same kitchen after a full remodel in the identical view — off-white shaker cabinets, quartz waterfall peninsula, full-height subway tile, stainless appliances and light oak flooring
Before
After

Illustrative example. Not a specific Cerpa project.

Planning a kitchen?

Send a few photos and tell us what bothers you about the kitchen. We will tell you what it actually takes — what moves, what gets opened, and where the money goes.

Call now (901) 350-4014